Suburban Water Systems

Select Your State

Pay Your Bill Online

Sign In

  • Utilities by State
    • Alabama
    • California
    • Florida
    • Louisiana
    • Oregon
    • South Carolina
    • Texas

My Account

My Account

Forgot username or password

Need a profile? Sign Up

  • Customer Care
    • Customer FAQ
    • My Account Portal
    • Pay My Bill
    • How To Read Your Bill
    • High Bill FAQ
    • Need help paying your bill?
      • LIHWAP
      • CAP
    • Low Pressure FAQ
    • Pressure Regulator FAQ
    • Service Area
    • Start or Stop Service
    • About Us
    • Our Mission And Values
  • Conservation
  • Community
    • Community Involvement
    • Supplier Diversity
    • Emergency Preparedness
    • News
    • Announcements and Notices
  • Environmental
    • Water Quality
    • About Our Water
    • Fluoride
    • Recycled Water FAQ
    • PFAS
    • California Waterscape
    • Groundwater Sources
    • Additional Resources
    • Lead and Copper Information
  • Regulatory
    • Rates and Tariff
    • Regulatory: Advice Letters
    • General Rate Case
    • GO103
    • Rights and Responsibilities
    • Joint Application
    • Affiliate Notices
    • Tribal Land Transfer Notifications
  • Lifeline
  • H2ome
  • Contact Us
  • Careers

June 13, 2024

Suburban’s Mastery in Managing the Mighty 30-inch Main

You are here: Home / Suburban / Suburban’s Mastery in Managing the Mighty 30-inch Main

When it’s time for maintenance on a critical water main, especially one as substantial as the 30-inch pipeline that serves our system’s largest zone, meticulous planning and expertise are non-negotiable. This 30-inch line is critical to our operation when customer demands soar in the summer. It also branches off Metropolitan Water District’s (MWD) substantial 73-inch feeder (a line so large that a 6-foot tall person can stand upright in it).

In March, an unused lateral branch posed a leak risk, threatening to catapult us into an emergency shutdown. With quick thinking and collaboration, the Engineering and Operations teams joined forces, showcasing their ability to synchronize and strategize. The operation was set for winter when water use dips, and the system could operate without this supply source.

The Operations & Maintenance crew sprang into action, initiating systematic dewatering of the pipeline, using safety protocols like Lockout Tagout (LOTO) of critical equipment, and navigating the complex network of isolation valves. The task required entry into deep vaults requiring caution; team members were equipped with full Personal Protective Equipment (PPE), including safety harnesses, fall protection hoists, and air-monitoring devices for the confined space.

Suburban 3 CAPEX Image 1

The successful operation stands as a testament to Suburban’s interdepartmental cooperation and our unyielding commitment to service continuity and safety. Through these carefully orchestrated efforts, Suburban maintains its pledge to provide uninterrupted, high-quality water service to all its customers.

 

By Jorge Lopez, PE, Vice President, Engineering

Filed Under: News, Suburban

News and Community

We take pride in our accomplishments and contributions to the communities we serve. Read our stories to learn more.

Recent Articles

thumbnail

Water-Infrastructure Alert for West Covina

… Read More

EmmaEmailBanners

Suburban Water Systems Investing $22.5 M in Local Infrastructure 

… Read More

Notice of Public Hearing for PHG Report

Notice of Public Hearing for PHG Report

… Read More

Footer1Text

 

  • Privacy Policy
  • Terms Of Use
  • Contact

Suburban Social

Instagram Facebook LinkedIn
Copyright © 2025 All Rights Reserved