Suburban Water Systems

Select Your State

Pay Your Bill Online

Sign In

  • Utilities by State
    • Alabama
    • California
    • Florida
    • Louisiana
    • Oregon
    • South Carolina
    • Texas

My Account

My Account

Forgot username or password

Need a profile? Sign Up

  • Customer Care
    • Customer FAQ
    • My Account Portal
    • Pay My Bill
    • How To Read Your Bill
    • High Bill FAQ
    • Need help paying your bill?
      • LIHWAP
      • CAP
    • Low Pressure FAQ
    • Pressure Regulator FAQ
    • Service Area
    • Start or Stop Service
    • About Us
    • Our Mission And Values
  • Conservation
  • Community
    • Community Involvement
    • Supplier Diversity
    • Emergency Preparedness
    • News
    • Announcements and Notices
  • Environmental
    • Water Quality
    • About Our Water
    • Fluoride
    • Recycled Water FAQ
    • PFAS
    • California Waterscape
    • Groundwater Sources
    • Additional Resources
    • Lead and Copper Information
  • Regulatory
    • Rates and Tariff
    • Regulatory: Advice Letters
    • General Rate Case
    • GO103
    • Rights and Responsibilities
    • Joint Application
    • Affiliate Notices
    • Tribal Land Transfer Notifications
  • Lifeline
  • H2ome
  • Contact Us
  • Careers

March 21, 2023

Plant 413 Electrical Upgrades

You are here: Home / News / Plant 413 Electrical Upgrades

Suburban Water Systems’ Plant 413 pump station is a critical facility serving residents in Unincorporated Los Angeles County (Whittier) and the City of La Mirada. This plant boosts well water from Plant 224 through a transmission pipeline (D-line has no customer services tapped) into higher elevation pressure zones for drinking, domestic, irrigation, and firefighting.

The pump station and electrical equipment were originally installed in 1961. Inspections by our Operations and Maintenance Teams and electrical consultants have revealed that the aging electrical equipment had deteriorated and replacement was needed.

Suburban has recently installed replacement electrical equipment to ensure the pump station is a reliable and resilient source of water supply. The new electrical panels have thicker walls to protect them better and maximize the life of the internal components. A Manual Transfer Switch (MTS) was installed so operators can safely power the plant with a diesel generator in case of an extended power outage when utility electricity is unavailable. Extended outages occur when fallen branches from windstorms damage powerlines, vehicles hit utility poles, and during Public Safety Power Shutdown (PSPS) events that de-energize power lines to prevent wildfires.

The pumps at this plant must run around the clock to meet customer demand and maintain pressure because this area does not have elevated storage tanks to provide a gravity supply. Variable Speed Drives (VSD’s) were installed to control the speed of the motor and pump to match production to demand while maintaining the desired pressure efficiently. A canopy was built to shelter operators and equipment from harsh weather conditions.

Generations of Suburban customers will benefit from this investment, and it’s part of our ongoing commitment to providing high-quality water service to the community.

Figure : New electrical panels with canopy

Plant 413 Electrical Upgrades | SouthWest Water Company

Filed Under: News, Suburban

News and Community

We take pride in our accomplishments and contributions to the communities we serve. Read our stories to learn more.

Recent Articles

thumbnail

Water-Infrastructure Alert for West Covina

… Read More

EmmaEmailBanners

Suburban Water Systems Investing $22.5 M in Local Infrastructure 

… Read More

Notice of Public Hearing for PHG Report

Notice of Public Hearing for PHG Report

… Read More

Footer1Text

 

  • Privacy Policy
  • Terms Of Use
  • Contact

Suburban Social

Instagram Facebook LinkedIn
Copyright © 2025 All Rights Reserved